Post by christinepeyreigne on Oct 2, 2013 18:01:46 GMT -5
Hello! I am fairly new here on the forum I am planning on becoming a falconer this year and I am building my mew next weekend. I would like to have some opinions of my set up...
So I chose to do the "combined" mews and weathering area
The structure will be- 15 feet long 10 feet wide 8 feet tall
Within this footprint, there is a 5 foot by 5 foot work area.
So a lot of the combined mews and weathering area seem to have a wall in between them. Is this required? I plan on having 1/2 of the structure covered and 1/2 of it not. This would follow all of my CT laws.
Here is a pic to better explain. Note that as of right now there is no plan for a wall in between the un covered and the covered
i dont like the 4.5 x 5 area(hutch). you might as well just add that on to your equipment room. no you dont need a wall between the mews and the weathering area but rhe way it's planned out now is that the main housing structure is 10x10 with an equipment room.